Sunday, December 11, 2011

FULL MOON

Saturday night there was a full moon over the city, it looked really cool from the top floor of our house!

Tuesday, December 6, 2011

HARDWOOD, PLUMBING AND ELECTRICAL...OH MY!

 Hardwood floors are almost finished being installed. 
 Concrete sink in powder room went in last week.
 Toilets were installed today
 Most of the lights have gone up.  These are the pendant lights above the island

 Rain shower in master bathroom
 Sienna dancing a jig on the hardwood floors in the loft

 loft flooring
 light fixtures in girls bedrooms
  
light fixtures above sinks in master bathroom
Master bedroom chandelier

Friday, October 14, 2011

MIRRORS AND SHOWER DOORS

Lower Bath
Girlsbath with mirrors and shower doors
Powder room with smoked glass border
Master bath mirror

Tuesday, October 11, 2011

RANDOM PICTURES

The house is coming together.  We are at the finishing stage but there are still so many things to finish!  Plumbing, light fixtures, most mirrors, all hardwood, some cabinetry doors and hardware, all appliances, glass in deck railing, exterior stucco and touch up painting.  These things all need to be done before we can move in.  Let's hope autumn can last at least six more weeks,  I don't want to move in the snow! 

Back of the house, stucco still needs to be finished, garage door will be painted to match, rails are up but are awaiting glass
Kitchen with morning light
Kitchen still awaiting appliances
Looking towards sitting room and computer area. 
Master bedroom, bathtub still needs to be moved to bathroom and installed
Girls bath/shower
Lower bathroom with finished tile in shower and floor
Back glass installed in dining room bar and storage unit
Most doors and handles have been installed
 Fireplace with finished tile.  Looking towards the back of the house Patiently awaiting the hardwood
Lower rec room with carpet