Saturday night there was a full moon over the city, it looked really cool from the top floor of our house!
Sunday, December 11, 2011
Tuesday, December 6, 2011
HARDWOOD, PLUMBING AND ELECTRICAL...OH MY!
Hardwood floors are almost finished being installed.
Concrete sink in powder room went in last week.
Toilets were installed today
Most of the lights have gone up. These are the pendant lights above the island
Rain shower in master bathroom
Sienna dancing a jig on the hardwood floors in the loft
loft flooring
light fixtures in girls bedrooms
light fixtures above sinks in master bathroom
Master bedroom chandelier
Saturday, November 5, 2011
Monday, October 31, 2011
Friday, October 14, 2011
MIRRORS AND SHOWER DOORS
Lower Bath |
Girlsbath with mirrors and shower doors |
Powder room with smoked glass border |
Master bath mirror
Tuesday, October 11, 2011
RANDOM PICTURES
The house is coming together. We are at the finishing stage but there are still so many things to finish! Plumbing, light fixtures, most mirrors, all hardwood, some cabinetry doors and hardware, all appliances, glass in deck railing, exterior stucco and touch up painting. These things all need to be done before we can move in. Let's hope autumn can last at least six more weeks, I don't want to move in the snow!
Back of the house, stucco still needs to be finished, garage door will be painted to match, rails are up but are awaiting glass
Kitchen with morning light |
Kitchen still awaiting appliances |
Looking towards sitting room and computer area. |
Master bedroom, bathtub still needs to be moved to bathroom and installed |
Girls bath/shower |
Lower bathroom with finished tile in shower and floor |
Back glass installed in dining room bar and storage unit |
Most doors and handles have been installed |
Fireplace with finished tile. Looking towards the back of the house. Patiently awaiting the hardwood
Lower rec room with carpet
Sunday, October 9, 2011
CARPET AND FINISHED TILE
Carpet was installed yesterday.
Upper hallway looking into the kids bedrooms
Staircase to loft |
Lower rec room |
Playing on the stairs |
Girls bedrooms |
Tile backsplash in girls bathroom |
Master shower floor |
Master bathroom |
Master bathroom shower |
Carrara marble in master bathroom floors and walls |
Mudroom lockers |
Mudroom tile
Tuesday, September 27, 2011
TILE IS ALMOST DONE
All the floor tile, wall tile and backsplash is almost complete.
Kitchen backsplash
Loft bar
Mudroom floor tile
kitchen island Caesarstone installed today
master bathroom make-up vanity countertop
master bath tub surround and tub skirt